Kia Ora Koutou, Hello everyone,
We trust you are all well and keeping warm.
We have uploaded on Moodle under Assessment no2, (which is Assignment No1), the revised drawings as required for your Assignments.
Remember, if you have added in your Assignment 1 any other information that is NOT shown in the revised Drawings, that is OK. It merely means that you have made some assumptions on what you think what the building could look like, when the drawings are developed further.
Remember, you are doing a Cost Plan Estimate during the Preliminary or Developed Design stage in which you have NOT got all the information available. You have not yet reach the Detail Design Drawings Stage.
And remember you are only providing a measure for Assignment No1. NO prices required. just the measure of Elements/Sub-Element with approximate quantities.
If you have any questions let us know.
stay safe everyone,
kind regards
Ronnie